Montrose Road Drainage Improvement Project

Menteith Place

Gabriela Gonzalez

Public Works Engineer

T: (305) 364-6100 x 1179
Questions: gonzalezga@miamilakes-fl.gov

Project Quick Facts

  • ITB 2026-01
  • Ground Breaking:
  • Estimated Completion: September 2026
  • Construction Cost: $453,380
  • Project Manager: Gabriela Gonzalez
  • Project Contractor: ATC Engineering Inc.
Overview

The Montrose Road Drainage Improvement project is an integral part of the Town’s comprehensive plan to reduce flooding. It involves enhancing the drainage system.

Details

The work consists of furnishing all labor, materials, machinery, tools, supplies, equipment, and services necessary for drainage and road improvements including drainage system installation and site restoration (including landscaping, concrete curb and gutter, aprons, street signs, etc) as detailed in the plans.

Affected Streets:

NW 82 Ave

Funding Source

Florida Department of Environmental Protection grant. 

Resolution No. 26.2153 | Authorizing the Town Manager to enter into a contract with ATC Engineering, Inc. for construction of the Montrose Road Drainage Improvement project