Canal Bank Stabilization Project Phase II

Description: The Canal Bank Stabilization Project Phase II is located along the southern portion of NW 170th Street, from the End Installation of Phase I (STA 81+65.50) at the eastern property line of 7831 NW 169th Terrace, continuing west bound to approximately 3,200 total linear feet. The project will stabilize the bank, improve canal appearance and canal performance, reduce sediment accumulation, increase flood protection, prevent erosion of homes during high water events, and protect private property values and ad valorem revenue.

Project Completion Date: Winter 2018

Recent Activity: Design 90% complete